 
                                 
                                Installed either before or after concrete pour to create activation from duct. NOTE: Drill a 2 1/2'' (64mm) hole in concrete and a 2 1/4'' (57mm) hole in duct.
- Send
- Save as PDF
- 
                    	Added to Favorites Go to favoritesRemove from favorites?Something went wrong. Please try again later.
Specifications
General Info
                | Application Sector | Commercial | ||
| Product Line | Wiremold | ||
| Country Of Origin | United States | ||
| Construction | Not Assembled | ||
| Warranty Type | 1-Year from Installation or 2-Years from Day of Sale | ||
| Standard | cULus Listed Underfloor Raceway: File E7020 Guide RKCZ cULus Listed Underfloor Raceway Fittings: File E11912 Guide RKQX. Meets Article 390 of NEC. | ||
| UPC Number | 786564217626 | 
Dimensions
                | Product Height US | 2.0 in | ||
| Product Length US | 2.484 in | ||
| Product Width US | 2.484 in | ||
| Product Weight US | 0.312 lb | 
Listing Agencies / 3rd Party Agencies
                | cULus ListingNumber | E26663 | ||
| cULus Listed | Yes | 
Trade Programs
                | USMCA | Yes | 
Additional Information
                | RoHS Compliant | Yes | This product meets the material restrictions of Article 4 of the RoHS Directive (2011/65/EU), including Commission Delegated Directive 2015/863. | 
Resources
Installation Instructions
Brochure
Guide Form Specifications
Cutsheet
Reviews
Bazaarvoice SAP Hybris Integration Version 2.8.1
Questions & Answers
Bazaarvoice SAP Hybris Integration Version 2.8.1
Recently Viewed
            Added to Favorites
            Go to favorites
        
        
            Remove from favorites?
            
            
        
        
            Something went wrong. Please try again later.
            
        
    436-2-23/8 | Wiremold
                        Installed either before or after concrete pour to create activation from duct.
                        
                        
